Wet room safety flooring – Crawley
Wet Room Walk In Shower – Crawley
This job originally had the same flooring fitted but badly. There were numerous holes were water was seeping through to the sub floor which made the vinyl bubble and smell. This area was cut out and the safety flooring was removed. The sub floor had to dry out before we fitted the new flooring. This took 2 days to dry and 1/2 a day to install the new flooring.