St Peters and St Pauls School Classroom
]
St Peter And St Pauls School
Refurbishment to classroom flooring. All floor coverings were removed with a stripper machine. There were 2 layers of old flooring to remove carpet stuck on linoleum. The floors were damp so we applied a damp proof membrane before latex was applied.
New linoleum flooring and hechmondwick stuck down carpet was used to create areas for the teacher and pupils.
Time to complete 2 days. Approx m2 linoleum = 65m2
Leave a Reply
Want to join the discussion?Feel free to contribute!